For a series pump system, place pressure measurement points at the suction of the first pump, at the discharge of every pump stage, and at the delivery point of the line. The most useful arrangement measures both sides of each pump: the discharge of one pump also shows the inlet pressure to the next pump, provided no significant branch or pressure-changing equipment lies between them. For a tailings line, add measurement points at important changes in elevation or long pipeline sections when needed to assess pressure loss. This layout helps operators evaluate each pump stage, identify abnormal pressure changes, and compare actual system conditions with the design.
You can find more information on our web, so please take a look.
In a series arrangement, the same flow passes through each pump in sequence, while each pump adds energy to the flow. Measuring only at the line inlet and outlet reveals the overall pressure change, but it does not show how much pressure each individual stage contributes. Intermediate readings make it easier to distinguish a stage-related issue from a pipeline restriction, changing slurry condition, or measurement problem.
Pressure is not identical to pump head. To compare pump performance accurately, engineers need to account for fluid density, elevation, velocity, and losses between measurement points. This is especially relevant for tailings, where solids concentration and mixture density can vary with operating conditions.
Install a pressure point on the suction pipe close to the first pump inlet, while allowing enough space to avoid interference with the pump connection and nearby fittings. This reading helps establish the pressure available to the first stage and can support checks for suction-side restrictions or changing supply conditions. Where suction pressure may be below atmospheric pressure, use an instrument suitable for vacuum as well as positive pressure.
For slurry service, avoid a connection that creates a long, narrow dead leg where solids could settle. A flush diaphragm arrangement may be considered where compatible with the process and instrument, but the final choice should account for slurry properties, pressure, temperature, and maintenance access.
Provide a pressure point on the discharge of every pump. In a two-pump system, the first pump’s discharge reading is also a practical indicator of the pressure entering the second pump if the section between them contains no significant elevation change, control valve, restriction, or branch. If such equipment is present, measure on both sides of it when the pressure loss or control effect must be evaluated.
For systems with three or more pumps, repeat this stage-by-stage approach. The pressure rise across a pump is assessed by comparing its inlet and outlet pressures, with appropriate corrections for elevation and other differences between the measuring locations. Separate readings help identify whether one stage is contributing less or more pressure than expected.
Install a measurement point near the end of the pumped line or at the defined delivery boundary, such as the receiving tank or process connection. This reading helps confirm the pressure available at the destination, rather than assuming that pump discharge pressure is fully available after pipeline friction and elevation effects. If the receiving point is far from the pump station, an additional pressure point can help distinguish line losses from pump-stage performance.
Intermediate pipeline measurements are useful when the line is long, has substantial elevation changes, or includes important valves, branches, or other equipment that may create pressure losses. They are not necessarily required at every pipe section. Select locations to answer a specific operating or troubleshooting question, and record the exact instrument position and elevation so readings can be compared consistently.
A basic two-pump series arrangement can be instrumented as follows: suction pressure before Pump 1, discharge pressure after Pump 1, discharge pressure after Pump 2, and pressure at the delivery boundary. Add a measurement before or after a significant valve or pipeline section if the project needs to assess its pressure effect. The table summarizes what each point can help evaluate.
Damei Kingmech Pump contains other products and information you need, so please check it out.
| Measurement point | Primary purpose | Interpretation note |
|---|---|---|
| First-pump suction | Assess inlet pressure and suction-side conditions | Consider vacuum capability and slurry-compatible connections |
| Each pump discharge | Compare pressure contribution by stage | Pair with the corresponding inlet reading and operating data |
| Final delivery point | Check pressure available at the destination | Account for elevation and losses along the line |
| Selected line sections | Investigate a suspected restriction or pressure loss | Place around the feature being evaluated |
Record suction and discharge pressure for each pump under the same operating condition. As an illustrative example only, a two-stage system might show a first-stage pressure rise of 0.6 MPa and a second-stage rise of 0.6 MPa. These figures are not a recommended design value or a performance guarantee; actual readings depend on the pump, slurry, flow, piping, and operating point.
When the pressure change across one stage differs from the expected value, investigate the operating conditions before concluding that the pump is faulty. Check flow rate, valve position, instrument calibration, slurry density, and whether the two measuring points differ in elevation. A changing pressure profile can reflect a system change as well as a pump issue.
Pressure difference can be converted to fluid head using the relationship between pressure, density, and gravity: head is approximately equal to pressure difference divided by fluid density and gravitational acceleration. Because tailings density may vary, a pressure difference does not correspond to one fixed head value unless the density used in the calculation is known. For meaningful comparisons, record slurry density and flow with the pressure readings whenever possible.
Where measuring points are at different elevations, include the elevation difference in the system analysis. Pressure can change with height even when no pump or valve is between the points. This is one reason that a reading taken at a pump nozzle should not automatically be treated as the pressure at a distant pipeline location.
On horizontal slurry piping, connection orientation should be selected with the slurry’s settling and air-entrainment behavior in mind. A connection at the bottom may be vulnerable to solids accumulation, while one at the top may be affected by trapped air in some services. Confirm the preferred orientation with the project’s piping and instrumentation team and the instrument supplier rather than applying a universal position.
A frequent mistake is installing a gauge only at the final pump discharge and assuming it represents every stage. That arrangement cannot show the pressure contribution of individual pumps or locate where a significant pressure change occurs. Another mistake is comparing readings taken at different times without recording flow, density, valve position, or pump configuration.
Also avoid treating a pressure tap as a substitute for a complete performance assessment. Pressure readings should be interpreted with flow and relevant process conditions, and instruments must be maintained and calibrated according to their applicable procedures. Before installation or maintenance, isolate and depressurize the relevant section in accordance with site safety requirements.
For a series pump system, measure pressure at the first pump suction, after every pump stage, and at the final delivery point. Add selected pipeline points where they can help evaluate elevation effects, restrictions, or pressure losses. This arrangement gives a clearer view of both individual pump stages and the complete tailings line.
Before finalizing the instrumentation plan, prepare a line diagram showing pumps, valves, elevation changes, and proposed pressure points. Confirm the expected pressure range, slurry properties, instrument compatibility, and safe maintenance arrangement with the project team. Damei Kingmech Pump can discuss pump-system requirements for mud and tailings applications; share the line layout and operating conditions to support a focused equipment and measurement-point review.